Objective
- Seeking a challenging
position as an
Instrument
Technician in a fast paced Start-Up environment where my skills and
experience will add maximum value to the client’s equipment.
Skills Overview
- Working knowledge of operational and application theory used in turbine power generation.
- Skilled at performing and documenting completion of maintenance, calibration, installation, fault location, and repair of electric, electronic, mechanical and pneumatic instruments and systems.
- Several successful years experience in a variety of roles working with many different types of electronic test equipment, systems and support equipment.
- Experienced with GE MarkV, MarkVI and a variety of Woodward governors on GE, Westinghouse, ABB, and Siemens gas and steam turbine generator, compressor, and mechanical drive systems.
- Experienced with Fisher, Rosemount, Foxboro, Honeywell, Yokogawa, Moore and Bentley-Nevada monitoring components and calibration devices. Also with GE, AEG Modicon and Allen Bradley PLCs and motor control centers.
- Experienced editing both DOS and Windows based operator interfaces and control software.
- Well versed at the interpretation of Piping and Instrument Diagrams, Signal Flow Diagrams, Wiring Diagrams, Panel Drawings, Loop Sheets, and Wire Lists.
Experience Overview
Click here
for
the
GoogleMaps version
08/00-Present
Controls Field Engineer
World-Wide (PenPower)
- Lead controls engineer or solo controls engineer on no fewer than 19 turbines in new installation or controls retrofit including many oddball and first of breed projects that no other engineers were comfortable taking.
- Quickly solved I/O, wiring, and controller problems while participating with completion of Start-Up Reports, mechanical inspections and performance testing.
- Performed dozens of service calls at various power plants, refineries, and paper mills too numerous to list here. Service work covered everything from 650MW main line steam turbines to aeroderivative engines and involved a good mix of GE Speedtronic Mark V, Mark VI, and Woodward governor systems.
- International travel to Southeast Asia, South America, Europe, Northern Africa, and the former USSR.
- Project list for my time with Penpower can be found at the end of this document.
05/00-07/00
Instrument Technician
(white paper permit
with UA local 597)
Calpine Morris Cogeneration
Plant in Morris, Illinois (Sheck Technical Services)
- As a Start-up team member, assisted in commissioning of one GE medium steam turbine and new Balance of Plant systems associated with the turbine.
- Performed calibrations, loop checks, functional testing and verification of control applications. Assisted with verification of Start-Up Reports and other documentation.
- Worked closely with GE representatives in troubleshooting an “on-the-fly” HMI upgrade.
- As a side note, I would later do a
service call at this site during my employment with PenPower.
03/00-05/00
Senior Controls
Engineer
Enron Lincoln Power
Center in Wilton Center, Illinois
(NEPCO)
- As a Customer
Representative and
Start-Up team
member, supervised the commissioning of eight GE Frame 7EA combustion
turbine generators. Supervised and verified calibrations,
loop
checks, functional testing and initial start-up. Generated
daily
progress reports for consumption by the Start-Up Manager.
01/00-03/00
Instrument
Technician
Chouteau Power project in
Pryor, Oklahoma
(AECI)
- Worked solo as
the liaison between the
instrumentation construction and start-up teams while reporting
directly to the Electrical Construction Manager. Plant
consisted
of two Siemens combustion turbines in a combined cycle configuration
with one steamer.
08/98-12/99
Controls Field
Engineer
World-Wide (Woodward
Governor
Company)
- Performed service calls and headed minor commissioning projects on Woodward governors for all manner of applications from 350HP paper line drives to 1MW emergency diesel gensets to 600MW Westinghouse steam turbine generators and nearly every conceivable application in-between.
- Commissioned or performed service calls on the 2301, 505, 501,503, 509, NetCon F/T, MicroNet simplex, and MicroNet TMR model governors. Also commissioned DSLC load controllers, Protech 203 overspeed protection systems and serviced a wide variety of third party control equipment, as customer needs required.
- Worked
extensively with
Woodward’s proprietary GAP programming language.
01/98-06/98
Instrument Technician
Koch
addition to the Warren Gas Plant in Venice, Louisiana (E.I.U.)
Nalco
dry polymer addition in
Garyville, Louisiana
(E.I.U.)
Marathon
sour gas harvesting and
treatment facility near Lawton,
Oklahoma (E.I.U.)
- Calibrated and loop shot every instrument at the Koch project in Venice. Completed my duties ahead of schedule giving me enough free time to work with Woodward personnel commissioning the governor installed during this capital improvement project.
- Promoted to
Foreman on the Nalco
project and
spearheaded the creation of a coherent tracking system to document
progress of instrumentation related construction activities.
08/97-11/97
Instrument /
Controls Technician
Amoco
Whitney Canyon sour gas harvesting field in Evanston, WY (Ross
Rae)
- Responsibilities included installation and maintenance of gas wellhead control systems and associated remote telemetry units.
- Worked as
a team with plant
maintenance personnel
to complete what had been described as one year’s worth of
backlogged work orders in less than three months.
11/96-08/97
Instrument / Electrical
Technician
Cargill
corn milling facility in Blair, NE
(Fru-Con)
- Maintained existing and installed new instrumentation, motors, VFDs, and MCC buckets. Primary area of responsibility was the Mill including Corn Storage and Feed Load-out. The Mill contained the most difficult applications in the plant.
- Worked
extensively with uncommon
instruments such
as Krohne Mass and Mag-Flow meters, radar and capacitive level
transmitters.
12/05-01/06
PDVSA Las Morochas. Ciudad Ojeda, Venezuela
Woodward 501 to MarkVI retrofit on an LM2500 generator drive originally
packaged by Stuart and Stevenson. Authored the
interconnection
list and ordered materials accordingly on site in the midst of
demolition activities. Authored various software changes and
reconfigured the Modbus communications link for increased data
transmission speeds. Mark VI / Intellution HMI
Still very
little Spanish.
10/05-11/05
Rompetrol Petromidia Refinery. Constanta, Romania
Commissioned three steam turbine compressor drives with Woodward
control systems. Woodward Micronet TMR/Intellution
HMI/MonitorGAP
9/05-10/05
ATCO Muskeg River Cogen. Fort McMurray, Alberta, Canada
Valve calibration and DLN tuning after Combustion Inspection on two
combined cycle Frame 7EAs with MkV HMI controls. Fixed many
miscellaneous HMI issues that were outstanding from original
commissioning. Implemented various TILs.
8/05
Sonatrach Stah compressor station. In-Amenas, Algeria
ITCC Tuning on two Frame 5 two stage gas compressors with Mark VI
controls.
6/05-8/05
ExxonMobil AGI/COGEN project. Labarge, WY
Resident Engineer for three GE 6B syn-gas turbines with Mark V TMR/HMI
multiple server installation. Implemented the last of the
software changes during commissioning and testing.
1/05-6/05
ExxonMobil Baytown Refinery. Baytown, TX
Controls retrofit from Woodward analog governor to Mark V Simplex/HMI
on a Westinghouse 251B model Gas Turbine/Generator set.
Responsible for all Mark V checkout and many late additions made by the
customer after FAT test.
12/04
SENECA. Porlamar, Venezuela
Controls Checkout and restart of three GE Frame 5 Turbine/Generator
sets coming out of major outages. Mark V simplex/
<I>. Very little
Spanish.
11/04
PDVSA Amuay Refinery Complex. Punto Fijo, Venezuela
Troubleshooting of Apple OpTrend HMI failure on first generation
Woodward Netcon controlling a GE Frame 5 Turbine/Generator
set.
No Spanish.
11/04
Dearborn Industrial Generation Services. Dearborn, MI
S17 software modification and restart on two GE Frame 7F
Turbine/Generator sets. Mark V/ <I>
11/04
Admiral Callaghan GTS Docked in Oakland, CA and initial post re-fit sea
trials in the Pacific Ocean.
Installed and checked out software modifications on two Woodward Netcon
5000 control systems governing the ships GE LM2500 aero-derivative
engines. No HMI. Cable remote interface and
Woodward
MonitorGAP only.
10/04
Mulberry Cogen. Mulberry, FL
Mark V/<I> on a 7E combined cycle unit. Tracked
down
various diagnostic alarms and nuisance trips and eliminated the root
cause. Performed Field Modification of TTRF calculation to
remedy
violent swings in gas splitter valve reference during fired shutdown of
the unit.
10/04
Calpine Broad River Energy Center. Gaffney, SC
Frame 7F with MarkV/ <I> controls. Implemented
various TILs and restarted the units.
10/04
City Public Services. San Antonio, TX
Tuned the valve curves on a GE 650MW mainline steam turbine.
Resuscitated an Intellution HMI after a total hard drive
failure.
Advised the customer concerning controls modifications they were
considering during the next planned outage on one of their Westinghouse
Steam Turbines. Woodward Micronet TMR/Intellution
HMI/MonitorGAP.
09/04
Boise Cascade. Jackson, AL
Reset Woodward 501 Governor after power loss to facilitate restarting
this Dresser-Rand Steam Turbine/Generator set. Performed
“post-mortem” analysis of unit trip that occurred
shortly
after going to “Island Mode” in preparation for a
hurricane. Advised customer concerning the order in which
they
should shed load next time they anticipate an orderly disconnection
from the Utility Grid.
4/04-8/04
Turkmengaz (Turkmenistan State Gas Company). Yylanli,
Turkmenistan
Commissioning of five Woodward Atlas Governors with iFix HMIs
controlling Nicolaev-Mashprayeva aeroderivatives driving Sumy-Frunze
Compressors. The control system for this natural gas
compressor
station was engineered by GE GCS in Bracknell, UK from start to finish
inclusive of turbine/compressor controls with anti-surge, the overall
station control and load balancing between the units (also with a
Woodward Atlas), sub-system station control with two GE Versamax PLCs
and fire control panels by Kidde Italia. Very little Russian
and
virtually no Turkmen, Uzbek, or Ukrainian language skills.
All
critical work and virtually all work onsite was executed with the
assistance of Russian language translators.
03/04
Eastman Chemical Longview, TX
Worked the night shift at the tail end of a steam retrofit.
Woodward Micronet.
03/04
Weyerhaeuser Paper Company. Albany, OR
Performed valve calibrations and assisted with startup of GE LM6000
after engine replacement. MarkV+/HMI.
03/04
British Sugar. Wissington, United Kingdom
Determined root cause of Woodward MicroNet TMR failures on a GE
LM6000. Assisted with restart and archiving of DLE tuning
values. Learned a little bit of “English”
English.
2/04-3/04
SECCO. Shanghai, People’s Republic of China
Assisted with the HMI pre-commissioning and DCS to Woodward interfacing
months in advance of this Steam Turbine Compressor drive being
installed.
1/04
Weyerhaeuser Paper Company. Springfield, OR
Tuned startup parameters on Woodward 509 governing a GE Steam
Turbine/Generator set. Advised customer concerning the newest
generation of GE and Woodward systems available for when the time comes
to retrofit their control system.
01/04
Integrated Turbine Compressor Controls (ITCC) Training.
Loveland, CO
This class introduced the control philosophy used by GE when
engineering compressor control systems. The focus was on
GE’s implementation of this philosophy when using Woodward
hardware.
12/03
Tenaska Gateway. Mt. Enterprise, TX
GE Frame 7F MarkV/ <I>. DLN remote tuning.
12/03
Tractebel Chehalis. Chehalis, WA
Frame 7F MarkV/ <I>. Card failure.
Also advised the customer regarding water wash sequencing.
12/03
Fredrickson LP. Tacoma, WA
MarkV/HMI GE A11 Steam Turbine. Simple sequencing change.
12/03
Weyerhaeuser Paper Company. Albany, OR
Conducted post-mortem trip analysis on LM6000 engine with intermittent
failures on the LP shaft MPUs. Root cause had been determined
and
remedied before my arrival on site. Executed HMI
modifications
and maintenance requested by the customer. MarkV+/HMI.
11/03
GE Aeroderivative and Package Services. Houston, TX
Commissioned the Houston Test Cell for use with LM2500+ and LM2500+DLE
engines.
Woodward NetCon with Intellution HMI, MonitorGAP and Ladder Logic.
10/03
Weyerhaeuser Paper Company. Albany, OR
Performed valve calibrations and assisted with restart of GE
LM6000. MarkV+/HMI
10/03
Shell Wilmington. Long Beach, CA
Executed software changes on Woodward 509 governor featuring a touch
screen interface. Woodward MOE (Menu Oriented
Editor).
Restarted Pratt+Whitney aeroderivative engine.
10/03
GE Aircraft Engines. Cincinnati, OH
Commissioned the remaining two LM1500 compressor drives with Woodward
AtlasSC governors. The first of these was commissioned in
4/03.
9/03
Mark VI BOP Training
Balance of Plant Training to complement MarkVI training received in
June.
7/03-8/03
GE Wind. House, NM
Picked up trash. Chased rattlesnakes. Climbed to
the top of a 350 foot wind turbine, then did it again.
6/03
Power Systems University
Advanced MarkVI course with Gas Turbine focus.
5/03
International Paper. Androscoggin, ME
Walked down a job to estimate how many hours it would take to install
and commission a Woodward 505 on a small steam turbine.
4/03-5/03
Great Lakes Gas. Cloquet, MN
Authored and installed a logic change to support new Power Turbine
breakaway sequencing specified by Dresser-Rand. GE LM1500
Woodward MicronetNT Simplex.
4/03
Detroit Edison Trenton Channel
Re-stroked steam valves after customer replaced their servos.
Oversaw restart of steam turbine. Customer education
regarding
the Full Arc to Partial Arc transition during startup. MarkV/
<I>.
4/03
Clark Public Utilities. Clark, AR
Assisted with restart of LM6000 after major outage. Woodward
Netcon/Intellution HMI.
4/03
GE Aircraft Engines. Cincinnati, OH
Commissioned the first of three LM1500 compressor drives for
GE’s High Altitude Test Cell.
AtlasSC/MonitorGAP/NoHMI.
4/03
Frederickson Power. Tacoma, WA
Sequencing changes, IGV calibration and restart of GE Frame 7F and A11
Steam Turbine/Generator sets. MarkV/HMI
3/03
Detroit Edison Trenton Channel
Resolved synchronization problems on GE Steam Turbine/Generator
set. Implemented <I> screen modifications per
customer
request. MarkV/ <I>
3/03
Wheelabrator. Lisbon, CT
Controls support for week-long steam turbine outage. Old
style Woodward 505.
6/02-7/02
MLNG. Bintulu, Malaysia
MarkII to MarkV Simplex retrofit on a GE Frame 5
5/02
Aquilla. Clay County, IL
Loop checks and first fire on the last of four GE Frame 7E turbines at
this site. Mark V/ <I>. Completed
first fire in less
than one week from the time the first loop was bought.
2/02-5/02
First Energy Sumpter. Belleville, MI
Four GE Frame 7EA Gas Turbine Mark V/ HMI. Lead Controls for
the installation and commissioning of the gas turbines.
1/02
NRG Audrain. Vandalia, MO
GE Frame 7EA Gas Turbine Mark V maintenance for the R-17 stage dilution
upgrade and performed DLN-1 tuning.
1/02
CalEnergy Calipatria, CA
Woodward 505 on an Atlas-Copco Turboexpander. Troubleshot
communications issues that turned out to be a module failure on the
customer’s DCS. Configured the customer’s
spare 505
with the tunable values from the running 505 to speed replacement time
in the event of a failure.
1/02
City Public Services. San Antonio, TX
Woodward Micronet maintenance to assist with problems with the DCS
interface.
12/01
Coastal Refinery. San Nicolaas, Aruba
Woodward 505 maintenance trouble shooting.
11/01, 1/02
SRW Cogen-Conoco. Orange, TX
Two GE Frame 7FA Gas Turbine Mark V/ <I> Controls to
assist in
the final stages of the commissioning and eliminate punch list items.
11/01
Consolidated Paper. Biron, WI
Woodward 505E Electronic Governor Control maintenance for valve
movement.
10/01
Cogentrix. Rathdrum, ID
GE 1X107FA Mark V Controls maintenance of both the gas and steam
turbine to investigate multiple trips and loss of speed reference.
10/01
Anchorage Municipal Light and Power. Anchorage, AK.
GE Frame 7EA Gas Turbine Mark V maintenance for various
alarms.
9/01
New York City Relief Project.
Assisted in the set-up, operation, and maintenance of portable package
generators for temporary electricity and lighting.
8/01
Calpine SkyGen Depere, WI
GE Frame 7FA DLN2+ Gas Turbine Mark V / <I>.
Added RTDs to Mark V I/O per customer request.
8/01
Calpine. Sumas, WA
GE Frame 7EA Gas Turbine and Medium Steam Turbine Mark V Controls
maintenance for various diagnostic alarms.
7/01
Weyerhaeuser. Pinehill, AL
GE 35 MW Medium Steam Turbine Mark V Controls maintenance to
investigate V3 valve chattering.
7/01
Calpine. Morris, IL.
GE 50 MW Steam Turbine Mark V Controls maintenance for
<C> core control problems caused by a fried controller
board.
6/01
GRE Coal Creek. Underwood, ND
GE Large G-2 Steam Turbine Mark V Controls maintenance for I/O failure,
alarms, and other trouble shooting issues.
1/01-6/01
Tenaska Lakefield Junction. Trimont, MN
Mark V Controls installation and commissioning of six GE Frame 7EA Gas
Turbines.
1/01
Colorado Springs Utilities. Fountain, CO
GE Frame 6B Gas Turbine Mark V maintenance for trouble shooting
processor function problems.
12/00
Operational Energy Corp / Honey Lake Power.
Investigate valve hunting/operational issues reported at higher load
ranges. Fitchburg Turbine with Woodward actuators and Control
system.
11/00
Great Northern Paper. Millinocket, ME
40 MW Back Pressure / extraction machine which had previously been
retrofitted with a Woodward 509 Governor. Worked
with the
Customer to fix control systems glitches that were causing the unit to
trip. Performed start up of the unit.
11/00
Oxy Chem. Houston, TX
MK V calibration and start-up after unit (7EA) forced outage.
Combustion spread problems. Splitter valve was removed for
cleaning, gas piping removed for cleaning.
10/00
International Paper (UCC) Savannah, GA
Fitchburg medium ST straight non-condensing unit. The outage
was
a minor inspection which included changing worn valve parts and valve
amplifier. Checkout of the Woodward 505 controls, stroked
control
vales and completed startup.
8/00-9/00
Power Systems University
Completed Speedtronic MkV Controls Class.
Have Passport. Will Relocate.
Will Travel.